GOALS
The principal design criteria is to join the new infrastructure to the existing one, like the V-21 highway to minimize the division of the territory and the creation of residual spaces among both infrastructures.
Extras
- Maneuvering area and green areas: 5,584.36 m2
- Asphalt track areas: 5,390.50 m2
- Concrete track and platform areas: 5,624.17 m2
- Built covered area: 13,255.88 m2
- Uncovered built area: 5,584.36 m2
- Initial term: 6 months
- Start date: January 24, 2018
- Proposed completion date: July 23, 2018
- Extension: 2 months and 22 days
- Completion date: October 15, 2018