7.000
Social Homes
Cliente
FONADE - Development Financial Fund (Territory)
Location
Multiple, Colombia
Consultancy, study, design & supervision
Environmental Impact Study for the construction and operation of the First Line of the Bogotá Metro of the stations, yards and workshops of the SITP Integrated Public Transport System
Cost: 11.582.012,00 €
GOALS
The works include the urbanization of the plot for the shipyard: Execution of two independent water networks – one with hydrants and the other with equipped fire hydrants (BIES) drinking water supply network and driving force to the niches of the dock as well as to the work tables of the dry dock, execution of a treatment plant for residual waters and another one for industrial waters.
Extras
- 100,000 Needy Families will be able to access a home
- Supervision of the design of 100,000 homes
- Construction management of 7,000 homes spread over 8 cities
- Inspection, control and administrative, accounting, financial, legal and technical monitoring of the design and construction of housing