Camp de Morvedre Drinking water supply
Cliente
Generalitat Valenciana / Consellería de Medio Ambiente, Agua, Urbanismo y Vivienda
Location
Camp de Morvedre, Valencia, Spain
Design & supervision
Cost: 15.334.573,95 €
GOALS
The purpose of these contracts is the redaction of drinking water supply projects in Camp Morvedre
Extras
- Phase 1 and 2: total pipe length: 36,690 m
- Phase 3: Total pipeline length: 10.722
- Phase 4: Total pipeline length: 6690 m