International Airport Simón Bolívar

Cliente

Aeronáutica Civil - AEROCIVL

Location

Santa Marta, Colombia

Airport Master Plan Update – PMA

Current evaluation, studies and designs runway expansion

Current status analisys Syst. Aerop (air and ground side)

  • Multicriteria analysis for selection of alternatives
  • Financial feasibility analysis
  • Adoption PMA under Resolution No. 02730 (AEROCIVIL)
Cost: X €

GOALS

Studies and Construction Designs for the Extension of the Runway

  • Increased runway length to reach TORA of 2,040m
    • Over the sea. coastline 550m to runway axis
  • Coastal and oceanographic dynamic studies
  • Provision of new turning platforms at both heads
  • RESA endowment 90m x 80m at each head
  • Increase strip width to 150m, adaptation of perimeter road
  • Provision of beaconing on the runway and new headers

Extras

  • Airport Systems Development Proposal
    • 2,040m x 40m track.
    • Layout of new terminal building (35,000m2)
      • Up to 7.3M PAX and more than 53,000 operat./year
    • New access to the terminal from the Caribbean trunk