Plant design and technology development engineering based on biostabilization
MSW Treatment Plant
Cliente
Diputación de Castellón
Location
Castellón, Spain
Cost: X
Extras
- Treatment capacity 200,000 tons/year
- Plant with Modular design (Different capacities)
- Waste Biostabilization Process
- Technology development and detail engineering
- Exclusive distributor of the technology patent