MSW Treatment Plant

Cliente

Diputación de Castellón

Location

Castellón, Spain

Plant design and technology development engineering based on biostabilization

Cost: X

Extras

  • Treatment capacity 200,000 tons/year
  • Plant with Modular design (Different capacities)
  • Waste Biostabilization Process
  • Technology development and detail engineering
  • Exclusive distributor of the technology patent