Parc Sagunt I

Cliente

Parque Empresarial de Sagunto, S.L.

Location

Sagunto, Spain

An urbanization project for an industrial area

Architecture & Design, Construction management, Engineering, environmental services

The threat of underground water pollution was solved by establishing a capture network for rain and wastewater which is being transported to a waste treatment plant.

Cost: 105.128.011,12 €

GOALS

This project develops the urbanization of 3 million square meters, which correspond to the interior vials of the industrial park and to the accesses of the same one, beside providing to the polygon (zone) of the infrastructures and necessary facilities.

Area

51,540m²

Extras

  • Capture network for rain and wastewater 
  • Urbanisation of 3’000’000 square meters 
  • Construction project for the extension of the CV-309 access highway to the structure