Parc Sagunt I
Cliente
Parque Empresarial de Sagunto, S.L.
Location
Sagunto, Spain
Architecture & Design, Construction management, Engineering, environmental services
The threat of underground water pollution was solved by establishing a capture network for rain and wastewater which is being transported to a waste treatment plant.
Cost: 105.128.011,12 €
GOALS
This project develops the urbanization of 3 million square meters, which correspond to the interior vials of the industrial park and to the accesses of the same one, beside providing to the polygon (zone) of the infrastructures and necessary facilities.
Extras
- Capture network for rain and wastewater
- Urbanisation of 3’000’000 square meters
- Construction project for the extension of the CV-309 access highway to the structure