Pueblo de Guzman Hybrid Park

Cliente

ENERSOL 2000, SL

Location

Pueblo de Guzman, Province of Huelva, Spain

Gaining Independence and Resilience for the Province of Huelva

Consultancy, Study, Supervision

The purpose of this preliminary project is to justify the design of a solar photovoltaic and wind power plant and evacuation infrastructure for the production of electricity for self-consumption

Cost: -

GOALS

Due to the current crisis it is more than ever necessary to diversify the energy mix with renewable energies to gain more independence in the region

Area

636.35 ha

energy output

74 MW

solar panels

14.160

Extras

  • The foundations for the wind turbine
  • Trenches for LV and MV conduits
  • The foundations for the placement of inverters and transformation centres
  • The construction of interior and perimeter roads
  • The installation of perimeter fencing
  • Foundations for the construction of the substation
  • Construction of the operation and maintenance building inside the substation