Road and pipeline reconstruction

Cliente

Republic of Colombia

Location

Barranquilla, Colombia

Channel the stream that runs alongside Barranquilla

Architecture & Design, Construction management, environmental services

The Barranquilla area had a big problem caused by watercourses formed by rainwater and their poor management.

Cost: 10.000.000,00 €

GOALS

186 houses and three roads are concerned, as well as a public green area with a surface of 4,622 m2 and 101 isolated units trees in roads.

Extras

  • Flooding
  • Damage to urban infrastructure
  • Damage to service networks
  • Environmental damage
  • Paralysis of industrial business
  • Deteriorating public health and accidents with loss of lifes