A durable solution to avoid floods
Poyo Ravine bassin canalization Study
Cliente
Gobierno de España
Location
Spain
Architecture & Design, Construction management, Engineering, environmental services, Program & project management
he Poyo Ravine basin, throughout the years, has suffered from numerous floods, causing important economic and human damages
Cost: 3.303.369,32 €
GOALS
Our proposed solution is a program of reforestation, hydrologic techniques, preventive vegetative treatments against forest fires and conditioning and improvement of the road net
Extras
- Creation and conservation of the natural ecosystems
- Improvment of the environment and landscape
- Collaboration in the recharges of aquifers and in the reduction of the downstream consequences caused by Mediterranean storms