Poyo Ravine bassin canalization Study

Cliente

Gobierno de España

Location

Spain

A durable solution to avoid floods

Architecture & Design, Construction management, Engineering, environmental services, Program & project management

he Poyo Ravine basin, throughout the years, has suffered from numerous floods, causing important economic and human damages

Cost: 3.303.369,32 €

GOALS

Our proposed solution is a program of reforestation, hydrologic techniques, preventive vegetative treatments against forest fires and conditioning and improvement of the road net

Extras

  • Creation and conservation of the natural ecosystems
  • Improvment of the environment and landscape
  • Collaboration in the recharges of aquifers and in the reduction of the downstream consequences caused by Mediterranean storms