Beniparrell's factory

Cliente

Naber S.A.

Location

Valencia, Spain

Industrial Building for the powder paint factory in Beniparrell

Architecture & design, engineering, environmental services

The project consisted of design of the industrial building for the powder paint production and an adjoining office and laboratory building.

Cost: 820.000,00 €

GOALS

Apart from the described works, medium and low voltage installations were designed, together with lighting, ventilation, powder cleaning and freezing installations for injection moulders and urbanization of the whole plot. 

Area

4900 m²

Extras

  •  Reinforced concrete footings and structure 
  • 3 types of concrete bed
  • Basalt and crystallized aluminium oxide
  • Medium and low voltage systems
  •  Lighting
  • Ventilation
  • Dust cleaning and freezing