Beniparrell's factory
Cliente
Naber S.A.
Location
Valencia, Spain
Architecture & design, engineering, environmental services
The project consisted of design of the industrial building for the powder paint production and an adjoining office and laboratory building.
Cost: 820.000,00 €
GOALS
Apart from the described works, medium and low voltage installations were designed, together with lighting, ventilation, powder cleaning and freezing installations for injection moulders and urbanization of the whole plot.
Extras
- Reinforced concrete footings and structure
- 3 types of concrete bed
- Basalt and crystallized aluminium oxide
- Medium and low voltage systems
- Lighting
- Ventilation
- Dust cleaning and freezing