Riba-Roja Urbanization
Cliente
FADESA
Location
Valencia, Spain
Architecture & Design, Construction management, environmental services
The Construction Project interventions for the Execution of the unit EU CASC 8 are located in the municipality of Riba- roja de Turia. The complex is next to the Valencia Metro Line 5.
Cost: 1.989.128,53 €
GOALS
186 houses and three roads are concerned, as well as a public green area with a surface of 4,622 m2 and 101 isolated units trees in roads.
Extras
- Wastewater Network.
 - Network of drinking water and fire.
 - Irrigation network.
 - Electrical power system.
 - Public lighting network.
 - Phone network, TV and telecomm
 - Storm water Network.
 - Wastewater Network.
 - Network of drinking water and fire.
 - Irrigation network.
 - Electrical power system.
 - Public lighting network.
 - Phone network, TV and telecommunications.
 - Gas networunications.
 
				