Benicarló WWTP and collectors

Cliente

EPSAR (Entidad Pública de Saneamiento de Aguas Residuales)

Location

Benicarló Castellón, Spain

Limit the environmental impact of wastewater

Consultancy, Study, Design

Cost: 24.152.851,14 €

GOALS

The present work consisted on the draft of the projects of Waste water treatment plant and general collectors at Beniccarló municipality, in Castellón

Diameters

Between 300 and 800 mm

length

21,7 km

daily average wealth

18.500 m3

Extras

  • Reduction of DBO5 for 94,44 % .
  • Introduction of a process of lengthy ventilation with work of arrival
  • Measurement of pretreated water, biological treatment of low load in two lines