Barranquilla road reconstruction

Cliente

Alcaldía de Barranquilla, República de Colombia

Location

Barranquilla, República de Colombia

Road Reconstruction and Conduction of the 84th Street Creek

 Architecture & Design, Construction management, Engineering, environmental services, Program & project management

The District of Barranquilla has historically had a major problem caused by the streams that run through its urban fabric, leading to stormwater runoff in the area, causing flooding, damage to urban infrastructure and service networks

Cost: 10.000.000,00 €

GOALS

The projected works are aimed at channeling the stream that runs along Calle 84, between Carreras 41B and 74, through the execution of a large buried collector, dimensioned for a return period of 100 years, with multicellular sections and an approximate length of 1,900 meters

length

1,900 meters

Extras

  • Severe floods that even caused deaths
  • Large buried water collector, dimensioned for a period of 100 years
  • Multicellular sections and length of 1,900 m