Bogotá Cableway
Cliente
IDU - Institute of Urban Development (Transmilenio)
Location
San Cristobal, Bogota, Colombia
Consultancy, study, design & supervision
The object of this Project is the execution of a shipyard for the manufacture and maintenance of large-length pleasure boats in the Port of Sagunto, on the Levante wharf where the Port Authority of Valencia (A.P.V.) has a plot of 31,632 m2 next to the Fisherman’s Port. For this, the A.P.V. has granted the promoter company: Vulkan Shipyard, S.L., an Administrative Concession.
GOALS
The works include the urbanization of the plot for the shipyard: Execution of two independent water networks – one with hydrants and the other with equipped fire hydrants (BIES) drinking water supply network and driving force to the niches of the dock as well as to the work tables of the dry dock, execution of a treatment plant for residual waters and another one for industrial waters.
Extras
- Allows access to the city in 15 min VS 180 min by car
- Marginal neighborhood (stratum 1-2) with slopes from 20º to 40º
- Work Investment 260,000 Mill COPs = 60 Mill €