MAD-VLC railway

Cliente

Government of Spain / A.D.I.F. (Administrator of Railway Infrastructures)

Location

Madrid-Castilla La Mancha-Comunidad Valenciana-Región de Murcia, Spain

Platform works of the new access to the east

Consultancy, study, design & supervision

It is one hour by highway from the city of Valencia and close to the main tourist destinations in the province of Castellón.


Cost: 30.457.000,00 €

GOALS

The present work consisted in the initial drafting of a basic project with the object of permitting the execution of the pub- lic activities previous to the beginning of the file. Subsequently, the Constructive Project of the trace that passes between the municipality terms of Venta del Moro, Fuenterrobles and Caudete de las Fuentes with an approximate length of 9,9 km was developed..

Dirt displaced

Was of the order of 1.000.000 of m3.

Work

Control and surveillance of these took place gathering all the relevant aspects

Curves

With major radius of 7.000 m and its corresponding clothoids.

Extras

  • 360 km Madrid – Valencia connected in 1h50′
  • Madrid – Castilla La Mancha – Com. Valencian – Murcia
  • Numerous bridges and tunnels throughout the route
  • Approximate investment of €10,000 million