Levante high speed train environmental integration

Cliente

Gobierno de España / A.D.I.F. (Administrador de Infraestructuras Ferroviarias)

Location

Gobierno de España / A.D.I.F. (Administrador de Infraestructuras Ferroviarias) Madrid - Castilla La Mancha - Valencia Region - Murcia Region

The study led to the best technical and environmental option

Consultancy, design & supervision

The present work consisted in the initial drafting of a basic project with the object of permitting the execution of the public activities previous to the beginning of the file.

Cost: 30.457.000,00 €

GOALS

The type of restoration projects of plants is compatible with the ecological characteristics of the environment and landscape through which the road passes, the utilization of seedling and the plantation of native species, well adapted to the environmental conditions, so assured treatment success while maintaining low costs.

Extras

  • Recovering of adjacent areas for the construction of roads
  • Stabilisation of slopes to stop erosion
  • Recovery of degraded soils platform construction
  • Defence and work structure