A collection network to improve the WWTP operations
Nules / Villavieja WWTP
Cliente
Conseil Général de Valence
Location
Nules and Villavieja. Castellón de la Plana, Spain
Supervision
The Project’s target was the implementation of a collection network in 1335 meters of concrete pipes with rubber seals with diameters ranking from 500 mm to 1200 mm
Cost: 3.800.000 €
GOALS
The executed collector network receive rain and waste populations from Nules and Villavieja
Extras
- Degreasing bath homogenisation
- Physical-chemical treatment
- Construction of biological reactor composed by two lines
- Realisation of a line of sludge treatment