Nules / Villavieja WWTP

Cliente

Conseil Général de Valence

Location

Nules and Villavieja. Castellón de la Plana, Spain

A collection network to improve the WWTP operations

 Supervision

The Project’s target was the implementation of a collection network in 1335 meters of concrete pipes with rubber seals with diameters ranking from 500 mm to 1200 mm

Cost: 3.800.000 €

GOALS

The executed collector network receive rain and waste populations from Nules and Villavieja

length

1335 meters

Extras

  • Degreasing bath homogenisation
  • Physical-chemical treatment
  • Construction of biological reactor composed by two lines 
  • Realisation of a line of sludge treatment