Terradillos de Sedano 1 Hybrid park
Cliente
Ayuntamiento de Terradillos de Sedano
Location
Terradillos de Sedano, Spain
Consultancy, Study, Design, Supervision
Cost: 42.620.000 €
GOALS
A preliminary project for a wind-photovoltaic hybrid plant with a photovoltaic plant with an installed capacity of 10 MW and the wind farm with 36 MW
Extras
- 17,784 modules for the photovoltaic installation
- 6 wind turbines