Riba-Roja Urbanization

Cliente

FADESA

Location

Valencia, Spain

Create roads but also green areas

Architecture & Design, Construction management, environmental services

The Construction Project interventions for the Execution of the unit EU CASC 8 are located in the municipality of Riba- roja de Turia. The complex is next to the Valencia Metro Line 5.

Cost: 1.989.128,53 €

GOALS

186 houses and three roads are concerned, as well as a public green area with a surface of 4,622 m2 and 101 isolated units trees in roads.

Area

4,622 m2

Extras

  • Wastewater Network.
  • Network of drinking water and fire.
  • Irrigation network.
  • Electrical power system.
  • Public lighting network.
  • Phone network, TV and telecomm
  • Storm water Network.
  • Wastewater Network.
  • Network of drinking water and fire.
  • Irrigation network.
  • Electrical power system.
  • Public lighting network.
  • Phone network, TV and telecommunications.
  • Gas networunications.