Riba-Roja Urbanization
Cliente
FADESA
Location
Valencia, Spain
Architecture & Design, Construction management, environmental services
The Construction Project interventions for the Execution of the unit EU CASC 8 are located in the municipality of Riba- roja de Turia. The complex is next to the Valencia Metro Line 5.
Cost: 1.989.128,53 €
GOALS
186 houses and three roads are concerned, as well as a public green area with a surface of 4,622 m2 and 101 isolated units trees in roads.
Extras
- Wastewater Network.
- Network of drinking water and fire.
- Irrigation network.
- Electrical power system.
- Public lighting network.
- Phone network, TV and telecomm
- Storm water Network.
- Wastewater Network.
- Network of drinking water and fire.
- Irrigation network.
- Electrical power system.
- Public lighting network.
- Phone network, TV and telecommunications.
- Gas networunications.