Benicarló WWTP

Cliente

Generalitat Valenciana / EPSAR

Location

Castellón, Spain

Benicarló´s WWTP and the nature

Consultancy & Supervision

Originally, it was a sewage treatment plant of lagoon type. The modernization works were conducted within following stages: waste pre-treatment, initial works – preliminary dust treatment, purifying and degreasing, biological reactor

Cost: 13.108.261,86 €

GOALS

  • Due to its nature, the project of Benicarló´s WWTP (Castellón) presents few design technical conditions determined by the presence of elements related to the process of purification

Diameters

Ranging from 150mm to 900mm

length

Close to 7km

functions

Aeration systems, dehydration, decanters, sludge thickeners & digesters.

Extras

  • Olive trees conservation and protection and existing carob-trees 
  • Micro topographic modification
  • Olive trees and carob-trees transplant from PID2 to PRV1b (16 units)